heraldlogo3

Mcdades

Yazoo-Herald-Digital-subscription-ad

power107-new

yazoo-valley-new

Finishing the job

If all goes as planned, Public Service Commission employees will be back in their offices on Mound Street by the end of the month. During Tuesdays PSC board meeting, it was announced that flooring is being installed and final touches made. Pictured Wednesday as he prepares to lay more tile is Leon Smith, left, of Hughes Flooring Covering of Yazoo City.  Also pictured is Sam Steele of Canton Roofing. If all goes as planned, Public Service Commission employees will be back in their offices on Mound Street by the end of the month. During Tuesdays PSC board meeting, it was announced that flooring is being installed and final touches made. Pictured Wednesday as he prepares to lay more tile is Leon Smith, left, of Hughes Flooring Covering of Yazoo City. Also pictured is Sam Steele of Canton Roofing.

 

glo-baker

<<  May 2013  >>
 Su  Mo  Tu  We  Th  Fr  Sa 
     1  2  3  4
  5  6  7  8  91011
12131415161718
19202122232425
262728293031 
Yazoo City, MS, US

Now
34.png
Fair
82°F, Windchill: 82°F
Wind: mph N
Humidity: 54%
Visibility: 0 mi
pressure: 30.19 in steady
Sunrise: 5:57 am
Sunset: 7:57 pm
Fri
33.png
Mostly Clear
Hi: 80°F, Low: 57°F
Sat
34.png
Mostly Sunny
Hi: 86°F, Low: 62°F
Home Lifestyles Finishing the job